Harnessing the Falls for a Harbor
An ambitious plan to use Tumwater Falls to power harbor dredging and tide land reclamation in Olympia.
The story, cleaned up
A cleaned-up reading of the newspaper page: spelling and layout repaired, one story lifted off a crowded page. It follows the original closely but it is not a transcription. The original page is below; read it if a detail matters.
A gentleman of Olympia has conceived the idea of utilizing the water power at Tumwater, a suburb, for generating electricity for the work of dredging Olympia harbor and redeeming the tide lands. At low water the falls at Tumwater produce 9,000 horse power, and a proposition for the utilizing of this power has been made to the company controlling it. The officials of the harbor commission have asked the light and power company for a formal proposition to furnish 450 horse power by electricity with which to finish their government contract in the harbor. The plans for the harbor improvement are elaborate as proposed by the harbor line commission and approved by the war department. The area of redeemed land will extend to the end of the long wharf, a distance of about a mile from the city front, covering an area of about six blocks at the south end and tapering to about 1,000 feet at the end of the long wharf.
“A gentleman of this city has conceived the idea of utilizing the water power at Tumwater, a suburb, for generating electricity for the work of dredging Olympia harbor.”
The turn-of-the-century struggle to reconcile Olympia's growing waterfront infrastructure with its natural geography mirrors contemporary debates about tide land usage and sustainable energy. The dream of using Tumwater’s power for major public works shows just how essential the Deschutes River power was to the city's early 20th-century expansion.
From readers
No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.