Same Streets
← All stories

The River Blockade

A standoff between the County Auditor and a local mill company reaches a breaking point over the Duwamish River.

County Auditor Twichell was engaged yesterday in blasting out the row of piling placed across the Duwamish River, opposite the county poor farm, by the Duwamish Mill Company. The drift wood and debris which came down the river during the last flood collected above this row of piles and diverted the current of the stream against the poor farm, threatening to wash away the barns belonging to the farm. The county commissioners ordered the mill company to remove the obstruction and, the order not being obeyed, Mr. Twichell was instructed to do the work at the mill company's expense.

“The drift wood and debris which came down the river during the last flood collected above this row of piles and diverted the current of the stream against the poor farm.”

— Printed in The Seattle Post-Intelligencer (Seattle, Wash. Terr. [Wash.]) 1888-1914, 1893
Then · 1893133 years apartNow · 2026

Conflicts over the Duwamish River have been a constant thread in Seattle’s history, moving from 19th-century log jams and industrial obstacles to the long-standing efforts of environmental remediation and Indigenous land reclamation today.

The original page

The Seattle Post-Intelligencer (Seattle, Wash. Terr. [Wash.]) 1888-1914, 1893-07-27. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
The Seattle Post-Intelligencer (Seattle, Wash. Terr. [Wash.]) 1888-1914, JUL 27, 1893, Page 6
Text
Cleaned up from the page — spelling and layout repaired — not a word-for-word transcription. The page itself is above, for exact wording.
Rights
Public domain
Place
47.55194, -122.34083 · placed automatically
The paper in the Library of Congress catalog ↗