Same Streets
← All stories

Northern Pacific Pushes Rail Construction Across the Cascades

The Northern Pacific Railway moves to bridge the gap between Yakima and Puget Sound, signaling a major boom for regional commerce.

Since the Port-Intelligencer first published the fact that Capt. T. F. King has been appointed engineer superintendent of the Cascade division of the Northern Pacific railroad, the company has pushed forward as rapidly as possible across the mountains. The company has formally entered into a contract with Mr. T. H. Bennett, of New York, the lowest bidder, to perform the work on a 125-mile section from Ainsworth west to Yakima. This section will cost a little over two million dollars. From the western end of this section, the old surveys will be re-run; F. G. Scarry and party have been ordered to do the work and are now on the ground. There is no longer any doubt that the Northern Pacific Railway Company is determined to build its road across the mountains to Puget Sound as soon as possible.

“There is no longer any doubt that the Northern Pacific Railway Company, under its present management, is determined to build its road across the mountains to Puget Sound.”

— Printed in Seattle Daily Post-Intelligencer (Seattle, W.T. [Wash.]) 1881-1888, 1883
Then · 1883143 years apartNow · 2026

The Northern Pacific's push across the Cascades in 1883 transformed Seattle from a remote outpost into a continental rail hub. Today, while passenger rail struggles for federal funding, the ghost of this massive infrastructure effort remains etched into the landscape of the Cascade mountain passes.

The original page

Seattle Daily Post-Intelligencer (Seattle, W.T. [Wash.]) 1881-1888, 1883-08-19. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
Seattle Daily Post-Intelligencer (Seattle, W.T. [Wash.]) 1881-1888, AUG 19, 1883, Page 3
Text
Cleaned up from the page — spelling and layout repaired — not a word-for-word transcription. The page itself is above, for exact wording.
Rights
Public domain
Place
47.60323, -122.33028 · placed automatically
The paper in the Library of Congress catalog ↗