Same Streets
← All stories

Engineering the Columbia River

A federal river and harbor bill brings $79,000 to navigate the treacherous rapids between Rock Island and Priest Rapids.

The passage of the river and harbor bill will provide engineers with sufficient funds to continue improvements on the Upper Columbia River in Washington. The most significant project involves the reach from the head of Rock Island Rapids to the foot of Priest Rapids, a 59.5-mile stretch where the river cuts through a spur of the Cascade Mountains. The plan, estimated to cost $138,000 with half allocated this fiscal year, utilizes 'auxiliary power' via scow wheels anchored in the rapids to assist boats, alongside blasting submerged rock obstructions. Engineers state that once active operations are pushed forward, these improvements will finally open this vital stretch to consistent commercial navigation.

“The improvement is expected to give a depth of five feet at low water stages.”

— Printed in The Yakima Herald (North Yakima, W.T. [Wash.]) 1889-1914, 1890
Then · 1890136 years apartNow · 2026

The infrastructure projects of the 1890s focused on taming the Columbia for sternwheelers and local grain transport. Today, the river's management remains a central, often contentious, civic issue in Yakima, shifting from navigation to hydroelectric power, irrigation, and salmon restoration.

The original page

The Yakima Herald (North Yakima, W.T. [Wash.]) 1889-1914, 1890-10-02. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
The Yakima Herald (North Yakima, W.T. [Wash.]) 1889-1914, OCT 2, 1890, Page 4
Text
Cleaned up from the page — spelling and layout repaired — not a word-for-word transcription. The page itself is above, for exact wording.
Rights
Public domain
Place
46.60156, -120.51084 · placed automatically
The paper in the Library of Congress catalog ↗