Same Streets
← All stories

The Paved Artery: Washington’s New Horizon

Engineers race to finish the state's first continuous paved highway, sparking dreams of interstate travel.

The story, cleaned up

A cleaned-up reading of the newspaper page: spelling and layout repaired, one story lifted off a crowded page. It follows the original closely but it is not a transcription. The original page is below; read it if a detail matters.

The attention of the entire nation will be attracted this fall to the fact that Washington has completed one paved highway traversing the entire length of the state. No costly demonstration is planned, but both an international and interstate demonstration will be staged that will break into print everywhere that people pay attention to highway work. The state highway committee, composed of Governor L. F. Hart, treasurer C. L. Babcock, and Auditor C. W. Clausen, has just completed an inspection of the paving work between Toledo and Kalama, that is to be completed during the coming summer. Highway Engineer James Allen, after having checked up the stock piles of sand and gravel that are on hand and gone over the plans for delivering cement to contractors on the ground, believes no delays can possibly occur unless the weather should be unusually bad. Orders will be issued that the paving shall be completed by August 1, and after being given a month to set, it can be opened to traffic early in September. It is planned to bring good roads workers from British Columbia to attend an Olympia meeting and a delegation from Oregon will be invited to be present. After the Olympia session, the good roads workers of two states and British Columbia will drive over the Pacific Highway from Olympia, formally open and dedicate the portion between Toledo and Kalama, and then go on into Portland for another joint demonstration.

“The attention of the entire nation will be attracted this fall to the fact that Washington has completed one paved highway traversing the entire length of the state.”

— Printed in White Bluffs Spokesman (White Bluffs, Wash.) 1907-1938, 1923
Then · 1923103 years apartNow · 2026

This early obsession with a 'coast-to-coast' style paved artery mirrors today's ongoing debates over infrastructure maintenance and the relentless expansion of I-5, which remains the backbone of the region's transport economy.

The original page

White Bluffs Spokesman (White Bluffs, Wash.) 1907-1938, 1923-04-20. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
White Bluffs Spokesman (White Bluffs, Wash.) 1907-1938, APR 20, 1923, Page 3
Rights
Public domain
Place
46.45097, -122.84506 · placed automatically
The paper in the Library of Congress catalog ↗