Same Streets
← All stories

City Overhauls Building Code

A special committee proposes sweeping changes to Tacoma's building ordinance to modernize oversight and safety standards.

After several months' consideration, the special committee appointed during Mayor Campbell's administration to revise the building ordinance has completed its work. An ordinance to 'regulate the erection, alteration and repair of buildings in the city of Tacoma' will be introduced at the council meeting tonight. The committee was composed of D. I. Cornell, contractor; O. L. Tuell, building inspector; Scott Snyder, member of the council, and Frederick Heath, architect. The committee found the present ordinance not at all suitable for a city the size of Tacoma, and many changes are proposed. Among other things, the new ordinance provides that a fee of $1 shall be charged for a permit for a building costing $1,000 or less, and a charge of 50 cents for each additional $1,000. For all buildings costing over $2,000, a copy of the plans must be filed with the building inspector. Permits for the removal of buildings will cost $5.

“The committee found the present ordinance not at all suitable for a city the size of Tacoma.”

— Printed in The Tacoma Times (Tacoma, Wash.) 1903-1949, 1904
Then · 1904122 years apartNow · 2026

Tacoma’s ongoing struggle with density, rapid development, and building safety remains as pertinent today as it was in the early 1900s. The shift toward requiring professional plan submissions mirrors the city's modern efforts to balance growth with structural accountability.

The original page

The Tacoma Times (Tacoma, Wash.) 1903-1949, 1904-08-31. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
The Tacoma Times (Tacoma, Wash.) 1903-1949, AUG 31, 1904, Page 3
Text
Cleaned up from the page — spelling and layout repaired — not a word-for-word transcription. The page itself is above, for exact wording.
Rights
Public domain
Place
47.24550, -122.43833 · placed automatically
The paper in the Library of Congress catalog ↗