Efficiency on the Waterfront
A clever engineering fix replaces a main mast in record time at the Seattle docks.
The story, cleaned up
A cleaned-up reading of the newspaper page: spelling and layout repaired, one story lifted off a crowded page. It follows the original closely but it is not a transcription. The original page is below; read it if a detail matters.
The ship Dashing Wave was getting in a new main mast yesterday, and the style of getting it in was in keeping with the chain lightning career of that vessel. Good, heavy strops were placed on it and, dispensing with the customary falls and purchases usual on such jobs, a single part of a heavy rope was rove at and led to the powerful steam donkey of Hansen & Co., and the word being given it was ran up in less than no time and as quickly lowered into its place. The entire job was performed in less than an hour.
“The entire job was performed in less than an hour.”
This vignette highlights the mechanical ingenuity of the Victorian-era Seattle waterfront. It serves as a contrast to today's fully automated shipping logistics, where individual craftsmanship is replaced by standardized containerization.
From readers
No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.