Same Streets
← All stories

The Ione Mill Dam Gave Way, Taking Half a Million Feet of Logs With It

A Tuesday afternoon break at the Panhandle Lumber Co. dam sent a 35-foot head of water through the canyon and delayed the mill for months.

The big dam of the Panhandle Lumber Co. at Ione broke Tuesday afternoon at 4 o'clock, entailing a loss of approximately $50,000. This will delay the starting of the big mill for perhaps two months.

The high water in the river will make it difficult to repair the damage. One half million feet of logs were lost, and the big barge was taken from its moorings and through the canyon.

The dam had a 35-foot head and was more than a quarter of a mile wide. The water was backed up Muddy creek for nearly a mile. Reconstruction will begin immediately.

“The dam had a 35-foot head and was more than a quarter of a mile wide.”

— Printed in The Newport Miner (Newport, WA) 1899-Current, 1910
Then · 1910116 years apartNow · 2026

Dam failures and industrial accidents still make headlines today, from aging infrastructure to the consequences for workers and local economies. In 1910, a single break at a lumber company dam could idle a mill town for months—a reminder of how tightly rural Washington's fortunes were tied to timber and water.

The original page

The Newport Miner (Newport, WA) 1899-Current, 1910-04-21. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
The Newport Miner (Newport, WA) 1899-Current, APR 21, 1910, Page 1
Text
Cleaned up from the page — spelling and layout repaired — not a word-for-word transcription. The page itself is above, for exact wording.
Rights
Public domain
Place
48.74133, -117.42048 · placed automatically
The paper in the Library of Congress catalog ↗