Same Streets
← All stories

The Unbuilt Dream: Engineering Seattle’s Ship Canal

In 1891, engineers surveyed the feasibility of connecting Puget Sound to Lake Washington, wrestling with the same geographical challenges and environmental trade-offs that define the city's infrastructure today.

The story, cleaned up

A cleaned-up reading of the newspaper page: spelling and layout repaired, one story lifted off a crowded page. It follows the original closely but it is not a transcription. The original page is below; read it if a detail matters.

The government survey of the proposed ship canal, which is to make Lakes Union, Washington, and Sammamish arms of the sea and fresh-water harbors, is drawing near completion. The work was begun in October, in charge of Engineer E. G. Eastwick, with a corps of thirty-one engineers. One party is now stationed at Redmond and another has been making soundings of Lake Union. Mr. Eastwick expects to complete the survey within two weeks. "The work we are doing now is only preliminary," said Mr. Eastwick. "We are simply making surveys and collecting data upon which to base plans and estimates. There is no doubt of the practicability of the canal, but its construction will depend largely upon its cost and the advantages to be derived from it." Mr. Eastwick noted he would like to raise Lake Union six feet above its present level, though this could not be done without inflicting great damages upon the improvements on the lake front. If any project is adopted, it is likely to be one reducing Lake Washington to the level of Lake Union. This would make Black River a feeder of the lake instead of its outlet, as at present. Additionally, the Sammamish slough is currently jammed with logs and will have to be cleared before the survey can be completed.

“There is no doubt of the practicability of the canal, but its construction by the government will depend largely upon its cost and the advantages to be derived from it.”

— Printed in The Seattle Post-Intelligencer (Seattle, Wash. Terr. [Wash.]) 1888-1914, 1891
Then · 1891135 years apartNow · 2026

The 1891 debate over canal placement, water levels, and the modification of Black River echoes Seattle’s ongoing struggle to balance rapid industrial expansion with the preservation of regional hydrology. Today, the canal remains a vital artery of commerce, yet the original engineering trade-offs continue to inform how the city manages its complex urban waterway system.

The original page

The Seattle Post-Intelligencer (Seattle, Wash. Terr. [Wash.]) 1888-1914, 1891-01-13. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
The Seattle Post-Intelligencer (Seattle, Wash. Terr. [Wash.]) 1888-1914, JAN 13, 1891, Page 7
Rights
Public domain
Place
47.63992, -122.33556 · placed automatically
The paper in the Library of Congress catalog ↗