Same Streets
← All stories

Expanding the Arteries of Tacoma's Waterfront

The Northern Pacific is laying new tracks and trestles along the bay to bridge the gap between rail and ship.

The Northern Pacific is making several important changes in its tracks along the waterfront. The switches throughout the yards are being ballasted and brought up to grade and a new track is being built connecting the switches with the track on the bay side of the Oriental dock. To accomplish this it is necessary to put in piling along the north end of the warehouse and construct trestle work for the support of the track. When the track is completed cars can be switched from the main line onto the wharf and unloaded directly into the vessels. This will greatly facilitate the handling of freight.

“When the track is completed cars can be switched from the main line onto the wharf and unloaded directly into the vessels.”

— Printed in The Tacoma Times (Tacoma, Wash.) 1903-1949, 1904
Then · 1904122 years apartNow · 2026

The waterfront and the rail infrastructure defined Tacoma's 20th-century growth. These structural changes represent the era of the 'booster' economy that established the city as a major shipping hub, long before the modern redevelopment of the Thea Foss Waterway.

The original page

The Tacoma Times (Tacoma, Wash.) 1903-1949, 1904-09-01. Library of Congress, Chronicling America.

From readers

No comments yet. If you know something about this story — a correction, a family memory, a source — it belongs here.

About this story

From
The Tacoma Times (Tacoma, Wash.) 1903-1949, SEP 1, 1904, Page 4
Text
Cleaned up from the page — spelling and layout repaired — not a word-for-word transcription. The page itself is above, for exact wording.
Rights
Public domain
Place
47.24550, -122.43833 · placed automatically
The paper in the Library of Congress catalog ↗